πŸ“ Los Angeles, CA  Β·  C-10 #981578  Β·  EVITP #4051604 ☎ (818) 302-5614

Panel Upgrade in
Sherman Oaks, CA

Professional 200A electrical panel upgrades for modern homes and EV readiness. Licensed, insured, and EVITP-certified. Free estimates. Same-day service available.

πŸ“ Serving Sherman Oaks & Surrounding Areas
πŸ… C-10 Licensed & Insured
⚑ EVITP-Certified #4051604
πŸ“‹ Permits & Inspections Handled

Professional Panel Upgrade in Sherman Oaks

AMY Electric provides professional 200A electrical panel upgrades throughout Sherman Oaks and the surrounding area. Many homes in Sherman Oaks were built with 100A service that can't handle modern loads β€” EV charging, central AC, electric appliances. We handle the complete upgrade from load calculation and utility coordination to the final inspection. Our electricians know the Sherman Oaks building department requirements and handle all permitting. Whether you need a panel relocation, a subpanel for a new addition, or a full 200A upgrade for EV readiness, we deliver clean, code-compliant work.

Panel Upgrade in Sherman Oaks β€” FAQ

How much does panel upgrade cost in Sherman Oaks? β–Ύ
A standard 100A to 200A panel upgrade in Los Angeles typically ranges from $2,500 to $4,500. This includes the new panel, main breaker, labor, permits, and final inspection. Additional costs may apply if the service mast or weatherhead needs replacement, or if trenching is required for underground service. We provide free estimates after an on-site evaluation and give you a detailed line-item quote so there are no surprises. Most panel upgrades are completed in 1-2 days.
Are you licensed to work in Sherman Oaks? β–Ύ
Yes. AMY Electric holds a California C-10 Electrical Contractor license (#981578), verified with the Contractors State License Board (CSLB). We carry full general liability insurance and workers' compensation coverage β€” provided upon request. Our EVITP certification (#4051604) covers EV charging infrastructure, and we maintain all required Los Angeles city business licenses. Every project is bonded, meaning you're protected financially.
How long does panel upgrade take in Sherman Oaks? β–Ύ
Most installs are completed in 2-4 hours for a straightforward job. More complex work may take longer. We'll give you a timeline during your free estimate.
Do you offer same-day service in Sherman Oaks? β–Ύ
Yes β€” we provide 24/7 emergency dispatch for urgent electrical issues. Call (818) 302-5614 anytime, day or night. We prioritize emergencies including power outages affecting only your home, sparking or smoking panels, exposed wires, and any situation involving water near electricity. Our electricians carry diagnostic equipment and common replacement parts to handle most emergencies on the first visit. When availability allows, we dispatch same-day for non-emergency repairs as well.
☎ Call (818) 302-5614 Free Estimate

Need panel upgrade in Sherman Oaks?

Call or request a free estimate β€” we respond same day.

☎ (818) 302-5614 Free Estimate Online