Residential Remodel & Renovation Electrical Cost in Los Angeles:
Complete Guide [2026]

C-10 Licensed #981578 $3,000–$15,000+ LADBS Permit Included

What remodel and renovation electrical costs in Los Angeles in 2026: kitchen, bath, and addition scope pricing, LADBS permits, timeline, panel upgrade triggers, and how the process runs from a C-10 licensed team.

Planning a Remodel in LA? AMY Electric handles the complete electrical scope: load calc, LADBS permits, new circuits, panel upgrade, and inspection — all priced in writing before work begins. C-10 #981578.
Remodel Services Calculate Estimate

What Remodel Electrical Costs in Los Angeles

Remodel electrical is priced by scope. These are the prices AMY Electric publishes for Los Angeles projects in 2026:

Scope / ItemTypical RangeNotes
Kitchen Remodel Electrical$3,000 – $8,000New circuits, appliances, lighting, GFCI
Bath Remodel Electrical$1,500 – $4,000GFCI, exhaust fan, lighting, heated floor
Addition (per sq ft)$5,000 – $15,000New circuits, panel, lighting, outlets
Whole-Home Remodel$8,000 – $25,000+Full rewire, panel, new circuits
Panel Upgrade (if needed)$2,500 – $4,500Often required for new circuits
LADBS Permit & Inspection$200 – $450Included in all-in quotes

Ranges reflect Los Angeles labor rates. A site visit confirms the exact scope. Estimates are free and provided in writing.

Electrical Scope Checklist by Room

🍳

Kitchen

Dedicated circuits for appliances, GFCI outlets, under-cabinet lighting, recessed lighting, island outlets.

🛁

Bathroom

GFCI outlets, exhaust fan circuit, heated floor, lighting, vanity circuits.

🏠

Addition

New circuits, lighting, outlets, smoke/CO detectors, panel capacity check.

⚡

Panel

Load calculation, upgrade if needed, new breaker spaces.

Permits, Inspections, and Timeline (LADBS)

  • Permit required. Remodel electrical requires an LADBS electrical permit and city inspection.
  • Permit fees included. LADBS fees ($200–$450) are included in our all-in quotes.
  • Timeline. Kitchen/bath: 1–3 days. Addition: 3–7 days. Whole-home: 1–2 weeks.
  • Inspection. LADBS inspects; we attend and provide the passed inspection record.

Los Angeles uses LADBS for electrical permitting, with online filing through PermitLA and ePlanLA. Never hire a contractor who suggests skipping the permit.

When a Panel Upgrade Is Required for a Remodel

  • Full panel. No spare breaker slots for new circuits.
  • Outdated panel. Federal Pacific, Zinsco, or Pushmatic panels must be replaced.
  • Load increase. New appliances, EV charger, or HVAC exceed capacity.
  • Insurance. Insurers may require a panel upgrade before issuing a policy.

Landlord and Primary Renovation Program

The LA Primary Renovation Program offers incentives for qualifying rental property upgrades. Electrical scope (panel, wiring, safety) may qualify. AMY Electric can advise on eligibility and documentation during the site visit.

Our Remodel Electrical Process

  1. Site visit and quote. We assess the scope, panel capacity, and code requirements, then provide a written estimate.
  2. Permit filing. We file the LADBS permit before work begins.
  3. Rough-in. We run new circuits, boxes, and wiring during the remodel phase.
  4. Trim-out. We install devices, fixtures, and cover plates after finishes.
  5. Inspection. LADBS inspects; we attend and provide the passed inspection record.
  6. Coordination. We coordinate with your general contractor to phase the work.

Frequently Asked Questions

How much does remodel electrical cost in Los Angeles?
Remodel electrical in Los Angeles costs $3,000 to $15,000 or more depending on scope. Kitchen remodels run $3,000–$8,000, bath remodels $1,500–$4,000, and additions $5,000–$15,000. AMY Electric provides firm written quotes after a site visit.
When is a panel upgrade required for a remodel?
A panel upgrade is often required when adding new circuits, large appliances, or an EV charger, or when the existing panel is full or outdated (FPE, Zinsco, Pushmatic). AMY Electric performs a load calculation during the site visit.
Do I need a permit for remodel electrical in LA?
Yes. Remodel electrical work requires an LADBS electrical permit and city inspection. AMY Electric files the permit, schedules the inspection, and attends it. Permit fees ($200–$450) are included in all-in quotes.
How long does remodel electrical take?
A kitchen or bath remodel electrical scope takes 1 to 3 days. A whole-home remodel or addition takes 3 to 7 days. LADBS inspection follows completion. AMY Electric coordinates with your contractor to phase the work.
Can I combine a panel upgrade with a remodel?
Yes, and it saves money. Upgrading the panel during a remodel avoids a separate project and a second permit. AMY Electric can bundle panel work into the remodel scope.
What is the LA Primary Renovation Program for landlords?
The LA Primary Renovation Program offers incentives for qualifying rental property upgrades. Electrical scope (panel, wiring, safety) may qualify. AMY Electric can advise on eligibility and documentation during the site visit.
Planning a Remodel?

AMY Electric provides free written estimates for remodel electrical across Greater Los Angeles. C-10 #981578.

☎ Call (818) 302-5614 Get a Free Estimate