Residential Remodel & Renovation Electrical Cost in Los Angeles:
Complete Guide [2026]
What remodel and renovation electrical costs in Los Angeles in 2026: kitchen, bath, and addition scope pricing, LADBS permits, timeline, panel upgrade triggers, and how the process runs from a C-10 licensed team.
Published: October 2026 · Updated: October 2026
What Remodel Electrical Costs in Los Angeles
Remodel electrical is priced by scope. These are the prices AMY Electric publishes for Los Angeles projects in 2026:
| Scope / Item | Typical Range | Notes |
|---|---|---|
| Kitchen Remodel Electrical | $3,000 – $8,000 | New circuits, appliances, lighting, GFCI |
| Bath Remodel Electrical | $1,500 – $4,000 | GFCI, exhaust fan, lighting, heated floor |
| Addition (per sq ft) | $5,000 – $15,000 | New circuits, panel, lighting, outlets |
| Whole-Home Remodel | $8,000 – $25,000+ | Full rewire, panel, new circuits |
| Panel Upgrade (if needed) | $2,500 – $4,500 | Often required for new circuits |
| LADBS Permit & Inspection | $200 – $450 | Included in all-in quotes |
Ranges reflect Los Angeles labor rates. A site visit confirms the exact scope. Estimates are free and provided in writing.
Electrical Scope Checklist by Room
Kitchen
Dedicated circuits for appliances, GFCI outlets, under-cabinet lighting, recessed lighting, island outlets.
Bathroom
GFCI outlets, exhaust fan circuit, heated floor, lighting, vanity circuits.
Addition
New circuits, lighting, outlets, smoke/CO detectors, panel capacity check.
Panel
Load calculation, upgrade if needed, new breaker spaces.
Permits, Inspections, and Timeline (LADBS)
- Permit required. Remodel electrical requires an LADBS electrical permit and city inspection.
- Permit fees included. LADBS fees ($200–$450) are included in our all-in quotes.
- Timeline. Kitchen/bath: 1–3 days. Addition: 3–7 days. Whole-home: 1–2 weeks.
- Inspection. LADBS inspects; we attend and provide the passed inspection record.
Los Angeles uses LADBS for electrical permitting, with online filing through PermitLA and ePlanLA. Never hire a contractor who suggests skipping the permit.
When a Panel Upgrade Is Required for a Remodel
- Full panel. No spare breaker slots for new circuits.
- Outdated panel. Federal Pacific, Zinsco, or Pushmatic panels must be replaced.
- Load increase. New appliances, EV charger, or HVAC exceed capacity.
- Insurance. Insurers may require a panel upgrade before issuing a policy.
Landlord and Primary Renovation Program
The LA Primary Renovation Program offers incentives for qualifying rental property upgrades. Electrical scope (panel, wiring, safety) may qualify. AMY Electric can advise on eligibility and documentation during the site visit.
Our Remodel Electrical Process
- Site visit and quote. We assess the scope, panel capacity, and code requirements, then provide a written estimate.
- Permit filing. We file the LADBS permit before work begins.
- Rough-in. We run new circuits, boxes, and wiring during the remodel phase.
- Trim-out. We install devices, fixtures, and cover plates after finishes.
- Inspection. LADBS inspects; we attend and provide the passed inspection record.
- Coordination. We coordinate with your general contractor to phase the work.
Frequently Asked Questions
How much does remodel electrical cost in Los Angeles?
When is a panel upgrade required for a remodel?
Do I need a permit for remodel electrical in LA?
How long does remodel electrical take?
Can I combine a panel upgrade with a remodel?
What is the LA Primary Renovation Program for landlords?
AMY Electric provides free written estimates for remodel electrical across Greater Los Angeles. C-10 #981578.