How Long Does an Electrical
Panel Upgrade Take in LA?
A panel upgrade is one of the highest-value electrical upgrades for an LA home - but homeowners are often surprised by the full timeline. Here's exactly what to expect.
Published: 2026-04-15 · Updated: 2026-06-20
How Long Does an Electrical Panel Upgrade Take in LA?
A standard residential panel upgrade is usually a one-day job - but the full process from quote to final inspection spans about one to three weeks. Here's the realistic breakdown for Los Angeles homeowners.
We inspect your panel, meter base, and service drop, then provide a fixed quote. No obligation.
LA city or county issues an electrical permit. We handle the submission; timeline varies by jurisdiction.
Power is shut off, the old panel removed, new 200-amp panel installed, circuits re-terminated and labeled.
A city/LADWP inspector signs off; we restore permanent power and walk you through the new panel.
Factors That Extend the Timeline
Meter Base Issues
If the meter socket or service mast is damaged or undersized, it must be replaced - adding a few days.
Knob-and-Tube
Homes with old wiring may need partial rewiring before a panel can be safely energized.
Permit Backlog
Some LA jurisdictions take longer to issue permits during peak season. We flag this up front.
Panel Upgrade Timeline FAQ
Can a panel upgrade really be done in one day? ▾
How long will I be without power? ▾
Do I need to be home during the upgrade? ▾
Why does the permit take so long? ▾
Can you upgrade the panel and add an EV circuit the same day? ▾
Need a Licensed Electrician in Los Angeles?
Get a free estimate from AMY Electric's C-10 certified team. Call today or request a quote online.
☔ Call (818) 302-5614 Free EstimateWritten by Amy
California C-10 Licensed Electrician · EVITP Certified · 15+ Years Experience
Amy is the founder and lead electrician at AMY Electric, serving Greater Los Angeles since 2012. He holds a C-10 Electrical Contractor License (#981578) and EVITP Certification (#4051604).