Federal Pacific (FPE) Panel Replacement Cost in Los Angeles:
Complete Pricing Guide [2026]

C-10 Licensed #981578 $2,800–$4,800 w/ Remediation LADBS Permit Included

What it costs to replace a Federal Pacific (FPE) Stab-Lok panel in Los Angeles in 2026: published pricing with remediation, the LADBS permit path, insurance and escrow implications, and how the job actually runs.

Federal Pacific Panel in Your LA Home? AMY Electric runs the complete replacement: load calculation, LADBS electrical permit, remediation of hazardous wiring, the panel swap, and the city inspection, all priced in writing before work begins.
Hazardous Panel Services Calculate Estimate

What a Federal Pacific (FPE) Panel Is and Why It Must Be Replaced

Federal Pacific Electric (FPE) Stab-Lok panels were installed in hundreds of thousands of homes across the United States from the 1950s through the 1980s, including a large share of Los Angeles housing stock built in that era. The Stab-Lok breaker design has a documented history of failing to trip during overcurrent conditions, which can allow branch-circuit wiring to overheat and ignite.

The U.S. Consumer Product Safety Commission (CPSC) investigated FPE breakers, and independent testing has shown failure-to-trip rates far above acceptable limits. No breaker swap, no "fix," and no maintenance procedure makes an FPE panel safe. Replacement is the only compliant path.

Insurance carriers in California increasingly refuse to write or renew homeowner policies on homes with FPE panels, and home inspectors flag them on nearly every report. If you see "Stab-Lok" on the breaker handle or "Federal Pacific" on the panel label, the panel is in the hazardous class and should be replaced.

Federal Pacific Panel Replacement Cost in Los Angeles

Because an FPE replacement is a service panel replacement with remediation, we quote it from the same published cost table as our panel upgrade cost guide, with the hazardous-panel row applied. These are the prices AMY Electric publishes for Los Angeles projects in 2026:

Scope / ItemTypical RangeNotes
Zinsco / Federal Pacific Replacement$2,800 – $4,800Hazardous panel replacement + remediation
100 Amp to 200 Amp Upgrade$2,500 – $4,500Standard 30–42 space breaker box; applies when no hazard remediation is needed
200 Amp to 400 Amp Upgrade$4,500 – $8,000Dual-panel or 320A continuous for large homes
New Subpanel (60A – 100A)$800 – $2,000Ideal for ADUs, garages, or additions; not a main panel replacement
LADBS Permit & Inspection Fees$200 – $450Included in AMY Electric all-inclusive quotes
LADWP / SCE Service Connection$300 – $600Utility fee billed for line upgrade/meter spot
Federal 25C Tax Credit (Inflation Reduction Act)Up to -$60030% tax credit for qualifying electric panel upgrades

The FPE row applies when the panel is a documented hazard. If additional remediation is needed (knob-and-tube, ungrounded circuits, damaged feeders), the project lands at the top of the range. Estimates are free and provided in writing.

What Moves Your Federal Pacific Replacement Price

⚠️

Hazard Remediation

Removing the FPE panel and remediating damaged or undersized feeders, bus bars, and connections adds labor and material.

📏

Meter-to-Panel Distance

Longer feeder runs, through finished walls or under a slab, add material and labor before the first breaker is set.

🏠

Amperage Upgrade

Moving from a 60A or 100A FPE service to a 200A modern panel adds cost for the larger equipment and utility coordination.

🧱

Wiring Condition

Older LA homes with knob-and-tube or ungrounded branch circuits may require grounding updates to pass LADBS inspection.

⚡

Utility Coordination

LADWP or SCE service connection fees ($300–$600) and any utility-side upgrade time run parallel to our work.

📐

Ceiling and Wall Access

Finished walls, stucco, or tight meter locations add labor for routing new feeders.

Permit and Code Considerations for FPE Replacement in LA

  • Permit required. A panel replacement requires an LADBS electrical permit and a city inspection against the California Electrical Code. AMY Electric files the permit, schedules the inspection, and attends it.
  • Permit fees included. LADBS permit and inspection fees ($200–$450) are included in our all-in quotes.
  • Code compliance. The new panel must meet current CEC requirements, including grounding, bonding, and arc-fault protection where applicable.
  • Utility coordination. LADWP or SCE may need to upgrade the service connection for higher amperage; this runs parallel to our work.

Los Angeles uses LADBS (Department of Building and Safety) for electrical permitting, with online filing through PermitLA and ePlanLA. Never hire a contractor who suggests skipping the permit on a panel replacement.

Insurance, Escrow, and Selling a Home with an FPE Panel

FPE panels create real-world friction beyond safety:

  • Insurance. Many California carriers refuse to write or renew homeowner policies on homes with FPE panels, or charge higher premiums. Replacing the panel can restore standard rates and coverage.
  • Escrow. Home inspectors flag FPE panels on nearly every report, and buyers commonly demand replacement or a credit before closing. Replacing before listing removes the objection.
  • Documentation. AMY Electric provides the LADBS permit record and passed inspection report that insurers, buyers, and escrow officers request.
  • Tax credit. Qualifying panel upgrades may be eligible for the Federal 25C tax credit (up to $600, 30%). Consult your tax professional.

Our Federal Pacific Panel Replacement Process

  1. Site visit and quote. We confirm the panel is FPE, check amperage and wiring condition, and provide a written estimate with the hazardous-panel row applied.
  2. Permit filing. We file the LADBS permit before work begins.
  3. Remediation. We remove the FPE panel and remediate any damaged feeders, bus bars, or connections.
  4. Installation. We install a modern breaker panel with appropriate amperage and circuit protection.
  5. Inspection. LADBS inspects the work; we attend and provide the passed inspection record.
  6. Documentation. We hand you the permit and inspection record for insurance and resale.

Frequently Asked Questions

How much does it cost to replace a Federal Pacific panel in Los Angeles?
Federal Pacific (FPE) Stab-Lok panel replacement in Los Angeles runs $2,800 to $4,800 with remediation. The range includes removal of the hazardous panel, installation of a modern breaker panel, LADBS permit and inspection, and any wiring remediation needed to meet code. Homes with additional hazards (knob-and-tube, ungrounded circuits) land at the top of the range. AMY Electric provides firm written quotes after a site visit.
Why is a Federal Pacific panel dangerous?
Federal Pacific Electric (FPE) Stab-Lok breakers have a documented history of failing to trip during overcurrent conditions, which can allow wiring to overheat and ignite. The CPSC investigated the issue, and many insurers now refuse to write or renew homeowner policies on homes with FPE panels. Replacement is the only compliant and insurable path; no breaker swap or "fix" makes an FPE panel safe.
Do I need a permit to replace a Federal Pacific panel?
Yes. A panel replacement requires an LADBS electrical permit and a city inspection against the California Electrical Code. AMY Electric files the permit, schedules the inspection, and attends it. Permit and inspection fees ($200–$450) are included in our all-in quotes. Never hire a contractor who suggests skipping the permit.
Will my insurance cover a Federal Pacific panel replacement?
Some insurers offer a credit or discount after documented replacement, and many require replacement before issuing or renewing a policy. AMY Electric provides the permit record and passed inspection report that insurers and escrow officers request. Check with your carrier for any available credit; we do not bill insurance directly.
How long does a Federal Pacific panel replacement take?
The physical swap takes four to eight hours with the power off. LADBS inspection typically follows within 48 hours. If LADWP or SCE must upgrade the service connection, add one to three weeks of utility-side time. From signed estimate to passed inspection, most replacements finish within one to three weeks.
Can I sell a home with a Federal Pacific panel?
Buyers and inspectors routinely flag FPE panels, and escrow often requires replacement or a credit before closing. Replacing the panel before listing removes the objection and produces a permit and inspection record that supports the sale price. Many sellers recover the cost in a faster, cleaner escrow.