C-10 #981578 | EVITP #4051604 (818) 302-5614 | info@amyelectric.com

Commercial Panel Upgrade Los Angeles

Outdated electrical panels are the #1 cause of commercial fire risk in Los Angeles. Upgrade to 400A+ service to handle modern equipment, meet code requirements, and protect your business.

Licensed C-10 Contractor After-Hours Scheduling Minimize Business Disruption

Signs Your Commercial Panel Needs Upgrading

Frequent Tripping

Breakers that trip regularly indicate your panel can't handle current electrical loads.

Federal Pacific or Zinsco Panel

These panels are known fire hazards. Insurance companies may deny coverage if they're present.

Insufficient Amperage

100A or 200A service can't support modern business equipment, HVAC, and EV charging.

Code Violations

Failed inspections or code violations require panel upgrades to bring your building into compliance.

Commercial Panel Upgrade Process

01

Assessment

We evaluate your current panel, load requirements, and business needs. Free on-site assessment.

02

Permits

We pull all required permits with LADBS and create an engineering plan.

03

Install

We install the new panel, transfer circuits, and upgrade service conductors. After-hours scheduling available.

04

Inspection

Building inspector verifies the work. You receive a signed permit and inspection certificate.

Commercial Panel Upgrades by Industry

Restaurants & Food Service

High-demand loads from commercial kitchens, HVAC, and refrigeration. 400-800A typical.

Medical & Dental Offices

Critical equipment requires reliable power. Dedicated circuits and backup systems.

Retail & Office

Modern point-of-sale, lighting, HVAC, and EV charging stations. 200-400A typical.

Industrial & Warehouse

Heavy machinery, 3-phase power, and large distribution panels. 800A-2,000A+ typical.

Commercial Panel Upgrade FAQ

How much does a commercial panel upgrade cost in Los Angeles? +

Commercial panel upgrades range from $5,000-$25,000+ depending on amperage, building size, and electrical complexity. A typical 400A upgrade for a small business runs $8,000-$15,000.

How long does a commercial panel upgrade take? +

Most commercial panel upgrades take 1-3 days. Larger projects with 800A+ service or complex distribution may take up to a week. We work after hours to minimize business disruption.

Do I need a permit for a commercial panel upgrade? +

Yes, LADBS requires a permit for all commercial electrical work. Our permit fee is included in your estimate. We handle all paperwork and inspections.

What size panel do I need for my business? +

Small retail/offices typically need 200-400A. Restaurants and medical offices need 400-800A. Industrial facilities may need 1,200A+. We assess your load requirements during the free estimate.

Can you upgrade my panel without shutting down my business? +

We schedule panel upgrades during off-hours (nights, weekends) to minimize disruption. For critical facilities, we can install temporary power during the transition.

Upgrade Your Commercial Panel Today

Get a free assessment and written estimate for your commercial panel upgrade. We work after hours to minimize business disruption.

Call (818) 302-5614